THU DUC BOO WATER PLANT PROJECT

Total investment: VND 1,600 billion

Form of investment: BOO, the Thu Duc BOO Water JSC is the developer where CII owns 52% of the chartered capital which is now transferred to the Saigon Water Company.

Payback method: The Saigon Water Supply General Company underwrites the entire water production volume of the project.

The pump station of raw water has capacity of 315,000 m3 / day. The water treatment plant has capacity of 300,000 m3 / day. The fresh water transmission pipeline of 25.7 km length has diameter from D900 mm to D2000 mm.

 

Construction was commenced in September 2005 and completed in the Q1 2010.