Total investment: VND 1,800 billion - Investment form: BOT - Investment body: JV between HCMC Infrastructure Investment JSC (CII) and Khanh An Commercial Beverages JSC. Investment details: Total length of the 4 sections under development: 22.38km.
An arterial bridge of the HCMC - Mekong Delta route. The bridge connects Tien Giang Province (My Tho) with Ben Tre Province, over the Mekong. Total length is 8,331 m, including approach ramps, the main bridge is 2,878 m. Total investment: VND 1,397 billion. Concession...
Total length of the route is 51.1 km starting from Than Cuu Nghia intersection and ending at the National Road 30 intersection. The road width is 13.75 m including 2 road lanes of 3.5 m width and 2 subsidiary lanes of 2.75 m width.
Total investment: VND 2,641 billion. Investment form: BT. Payment by land allocation in Thu Thiem New Urban Area.
Total investment: VND 2,110 billion. Form of investment: BOT, the Ninh Thuan Province BOT One Member Limited Company is the developer. Payback method: toll way charge collection within 16.5 years.
At the North-East Gateway of Ho Chi Minh City - one of the highest traffic density areas in Vietnam, the bridge have 10 lanes and total investment: VND 1,000 billion. Concession period: Toll way collection from 2013 to 2017.
The project expands Binh Trieu Bridge 1 from 2 lanes to 3 lanes with the bridge deck width at 12.6m. Along with Binh Trieu 2 Bridge project, this project has contributed to relieving traffic pressure in this key area where National Highway 13 passes through...
Saigon 2 Bridge was built in parallel to the existing Saigon Bridge, connecting Binh Thanh District with District 2. The bridge has the total length of 987m, the road sections at the 2 ends are 350m long in Binh Thanh District, and 117m long in...
The route’s total length is 15.7km starting from Saigon Bridge to Dong Nai Bridge junction. The project entails upgrade works to expand the main road from 24m to 34m, from 41m to 48m, and construction of 02 new parallel roads at 2 sides, 12m width...